Eight free practice questions on BC Electrical Code calculations: loads, ampacity and motors, for Unit D (BC Electrical Code Calculations) of the TicketPrep bank for the BC electrical Field Safety Representative (FSR) certificate of qualification exam, Classes A, B and C. Technical Safety BC sets and delivers the exam. These are original questions written by TicketPrep from the BC statutes, the Technical Safety BC directives and bulletins and the Canadian Electrical Code Rule numbers, not questions from the exam. Each has four options and one correct answer, as every question in our bank does. Answer each one before opening the explanation. No account, no email.
01The questions
-
In a strata townhouse's 120/240 V panelboard, about 40 branch-circuit conductors run bundled through the wiring space to their breakers. Under Rule 4-004, what correction factor applies to them inside the panelboard?
- None, as they are in equipment where they terminate
- Table 5C, on the number of conductors in each bundle
- Table 5C, on every conductor inside the whole enclosure
- None, but only if each bundle is shorter than 600 mm
Show the answer
A. Correct. Rule 4-004 7) a) ii) says the Rule's correction factors do not apply to conductors inside electrical equipment for their termination there. Any Table 5C factor comes from how the conductors run in raceway or cable on the way to the panelboard (4-004 1) c)).
Why not the others
B. Bundling brings in Table 5C in a raceway or cable run, but Rule 4-004 7) a) ii) exempts conductors inside electrical equipment for termination, so no factor applies within the panelboard.
C. Counting every conductor in the enclosure treats the panelboard like a raceway. Rule 4-004 7) a) ii) takes conductors inside equipment for termination out of the correction factors altogether.
D. The 600 mm figure belongs to cables run in contact or closely spaced single-conductor cables (4-004 12), 13)). Inside equipment for termination, 4-004 7) a) ii) removes the correction factors whatever the length.
Source: TSBC FSR exam, Code (our Unit D: BC Electrical Code Calculations); CEC Rule 4-004
-
A 40 A, 120/240 V feeder will run to a strata complex's storage building whose loads have not yet been chosen. On what current must the FSR base the voltage-drop check under Rule 8-102?
- 100 % of the 40 A breaker rating
- 80 % of the 40 A breaker rating
- 125 % of the expected connected load
- The full ampacity of the feeder conductors
Show the answer
B. Correct. Rule 8-102 1) uses the connected load when it is known and otherwise 80 % of the rating of the overcurrent device: 0.80 × 40 A = 32 A here, with the drop held to 3 % in the feeder and 5 % overall.
Why not the others
A. The full breaker rating overstates the design load. When the load is unknown, Rule 8-102 1) takes 80 % of the device rating: 32 A.
C. No load is known here, and Rule 8-102 adds no 25 %; with an unknown load it takes 80 % of the overcurrent device rating.
D. Conductor ampacity is not the basis. Rule 8-102 1) uses the known connected load or, when it is unknown, 80 % of the overcurrent device rating.
Source: TSBC FSR exam, Code (our Unit D: BC Electrical Code Calculations); CEC Rule 8-102
-
The FSR checks a 240 V single-phase orchard irrigation pump: nameplate FLC 25 A, continuous duty, protected by a 60 A inverse-time breaker chosen under Table 29. Starter and disconnect terminations are marked 75 °C. Table 2 gives copper 25 A for No. 12 and 35 A for No. 10 at 75 °C. Under Rule 28-106, what is the smallest copper conductor permitted?
- No. 6 AWG
- No. 8 AWG
- No. 10 AWG
- No. 12 AWG
Show the answer
C. Correct. A continuous-duty motor's branch conductors need at least 125 % of FLC (Rule 28-106 1)): 1.25 × 25 = 31.25 A. On a 75 °C basis (Rule 28-104 1) c), terminations marked 75 °C) No. 10 copper carries 35 A, while No. 12 carries only 25 A.
Why not the others
A. No. 6 sizes the conductors to the 60 A breaker. Motor branch conductors are sized on the FLC (Rule 28-106 1)); Rule 28-200 lets the branch breaker exceed their ampacity, and the overload device protects them. 1.25 × 25 = 31.25 A: No. 10.
B. No. 8 comes from the 60 °C column, where No. 10 copper carries 30 A, less than 31.25 A. Rule 28-104 1) c) bases motor supply conductors on 75 °C ampacity, and these terminations are marked 75 °C: No. 10 (35 A) suffices.
D. No. 12 carries 25 A, which meets the FLC at 100 %. Rule 28-106 1) requires 125 % for continuous duty: 31.25 A, beyond No. 12's 25 A at 75 °C.
Source: TSBC FSR exam, Code (our Unit D: BC Electrical Code Calculations); CEC Rules 28-106, 28-104
-
A detached workshop's 120/240 V feeder uses three No. 4 copper conductors with an ampacity of 85 A (75 °C terminations), and its Section 8 calculated load is 78 A, not continuous. Standard breakers near the answer are 70, 80, 90 and 100 A, as in Table 13's rating column. Under Rule 14-104, what is the largest feeder breaker permitted?
- 70 A
- 80 A
- 90 A
- 100 A
Show the answer
C. Correct. No standard breaker equals 85 A, and the 78 A load is a Section 8 calculated load within the ampacity, so Rule 14-104 1) a) lets Table 13's rating for 81 to 90 A, 90 A, be used (the allowance runs to 800 A). The conductors still carry no more than 78 A.
Why not the others
A. 70 A derates the 85 A ampacity to 80 % first (68 A). That continuous-load limit of Rule 8-104 does not apply to this non-continuous load; Rule 14-104 1) a) with Table 13 allows 90 A.
B. 80 A rounds down to the standard rating below 85 A. Rule 14-104 1) a) allows the Table 13 rating where no device equals the ampacity and the load is a Section 8 calculated load not above it: 90 A.
D. 100 A is 125 % of the load (97.5 A) rounded up, a continuous-load habit applied to a non-continuous load. The device may not exceed the conductor ampacity except as Table 13 allows: 90 A.
Source: TSBC FSR exam, Code (our Unit D: BC Electrical Code Calculations); CEC Rule 14-104
-
A lakeside resort's 240 V supply to a boathouse 350 m away uses a step-up and step-down transformer pair laid out as TSBC's bulletin IB-EL 2017-02 describes. The step-down secondary feeds the boathouse panel through No. 8 copper conductors protected at 40 A. What minimum copper grounding conductor does the bulletin call for at the step-down secondary's centre point?
- No. 4 AWG
- No. 6 AWG
- No. 8 AWG
- No. 10 AWG
Show the answer
B. Correct. IB-EL 2017-02 has the centre point of the step-down transformer's secondary grounded with at least No. 6 copper (or No. 4 aluminum), at the distribution panel's main neutral bus or at the transformer as Rule 10-212 allows, with the system bonding jumper connected at the same point.
Why not the others
A. No. 4 is the bulletin's minimum for an aluminum grounding conductor. For copper, IB-EL 2017-02 calls for at least No. 6.
C. Rule 10-114 2) lets a grounding conductor go below No. 6 down to the size of the system's conductors, which would point to No. 8 here, but TSBC's bulletin sets No. 6 copper as the minimum for this arrangement.
D. No. 10 is Table 16's size for a 40 A device, which sizes bonding conductors. A grounding conductor is not taken from Table 16; the bulletin calls for at least No. 6 copper.
Source: TSBC FSR exam, Code (our Unit D: BC Electrical Code Calculations); CEC Rules 10-114, 10-212; TSBC IB-EL 2017-02
-
A triplex of three 92 m² units (no basements) shares one 120/240 V service. Each unit's Rule 8-200 1) a) load is 21 000 W, which includes 6 kW of baseboard heat with room thermostats; there is no air conditioning or EVSE. Following TSBC's bulletin IB-EL 2014-01 for row housing, what is the service calculated load?
- 172.5 A
- 210.4 A
- 220.4 A
- 239.2 A
Show the answer
D. Correct. Each unit takes the greater of a) and b): 24 000 W. Heat out: 18 000 W each. Demand steps: 18 000 + 0.65 × 36 000 = 41 400 W. Heating summed, 18 kW: 10 000 + 0.75 × 8000 = 16 000 W. Total 57 400 W ÷ 240 V = 239.2 A (IB-EL 2014-01 method).
Why not the others
A. This takes the heating out of the units but never adds it back. After the demand steps (41 400 W), Rule 8-202 3) b) adds the summed heating at Section 62 demand, 16 000 W, for 57 400 W = 239.2 A.
B. This runs each unit at its method a) load (21 000 − 6000 = 15 000 W). Each unit enters at the greater of a) and b); at 92 m², b) gives 24 000 W, so each unit is 24 000 − 6000 = 18 000 W before the demand steps, for 239.2 A.
C. This puts the third unit at 40 %. Rule 8-202 3) a) takes 65 % of the next two units after the heaviest: 18 000 + 0.65 × 36 000 = 41 400 W, not 18 000 + 11 700 + 7200 = 36 900 W; with the 16 000 W of heat the total is 57 400 W = 239.2 A.
Source: TSBC FSR exam, Code (our Unit D: BC Electrical Code Calculations); CEC Rules 8-200, 8-202, 62-118; TSBC IB-EL 2014-01
-
A six-unit strata walk-up has a 120/240 V service. Unit loads with EVSE, heat and air conditioning removed are 8200, 8200, 7600, 7600, 7000 and 7000 W. Each unit has 4 kW of baseboard heat (room thermostats). Four units have a 7.2 kW EVSE on the unit panel; two more 7.2 kW EVSE are on the house panel, which also feeds 6000 W of other house loads. No EVEMS. Applying IB-EL 2023-05, what is the calculated load?
- 272.8 A
- 392.8 A
- 407.3 A
- 437.8 A
Show the answer
B. Correct. Demand steps: 8200 + 0.65 × 15 800 + 0.40 × 14 600 + 0.25 × 7000 = 26 060 W. Heat 24 kW summed: 10 000 + 0.75 × 14 000 = 20 500 W. EVSE 6 × 7200 = 43 200 W at 100 % (IB-EL 2023-05). House loads 0.75 × 6000 = 4500 W. Total 94 260 W ÷ 240 V = 392.8 A.
Why not the others
A. This adds only the two house-panel EVSE, the bare text of Rule 8-202 3) d). TSBC's IB-EL 2023-05 enforces all EVSE at 100 %, unit-panel EVSE included: 94 260 W = 392.8 A.
C. This takes the heating at its full 24 kW, as when 62-118 3) is applied to each 4 kW unit separately. Applied to the summed heating it gives 20 500 W, so the total is 94 260 W = 392.8 A.
D. This adds the EVSE at 125 % (54 000 W). In the service calculation EVSE is at 100 %; the 125 % belongs to each EVSE branch circuit (Rule 86-302). Total 94 260 W = 392.8 A.
Source: TSBC FSR exam, Code (our Unit D: BC Electrical Code Calculations); CEC Rules 8-202, 62-118; TSBC IB-EL 2023-05, IB-EL 2014-01
-
An orchard's 240 V irrigation pump is fed by a 60 m run of 2-conductor ACWU90 cable with a bonding conductor: buried for 57.2 m, then 2.8 m up a sunny pole to the controller, where its ampacity is lower. Which ampacity may the FSR use for the cable?
- The riser ampacity; the exemption covers only buried short parts
- The riser ampacity; the lower value governs any mixed run
- Neither; the riser part must be upsized to the buried ampacity
- The buried ampacity; 2.8 m is within the 3 m limit
Show the answer
D. Correct. Rule 4-004 16) normally applies the lower ampacity across an underground-to-above-ground transition, but 4-004 17) allows the higher one where the lower-ampacity part of a run of no more than four conductors (three here) runs no farther than the smaller of 3 m and one-tenth of the circuit length: one-tenth of 60 m is 6 m, so 3 m governs, and 2.8 m qualifies.
Why not the others
A. Rule 4-004 17) concerns the part with the lower ampacity, wherever it lies; here that is the riser. At 2.8 m it is within the 3 m limit, so the higher buried ampacity applies.
B. The lower value is the general rule (4-004 16)), but 4-004 17) lets the higher one apply when the lower part is short: no more than the lesser of 3 m and 10 % of the length. 2.8 m is within 3 m.
C. No rule requires the short riser to be upsized: Rule 4-004 17) lets the higher buried ampacity apply to the whole run when the lower-ampacity part is no longer than the lesser of 3 m and 10 % of the length. 2.8 m qualifies.
Source: TSBC FSR exam, Code (our Unit D: BC Electrical Code Calculations); CEC Rule 4-004
02Answer key
| Question | Answer | Our objective |
|---|---|---|
| Q1 | A | Objective D-4 |
| Q2 | B | Objective D-5 |
| Q3 | C | Objective D-7 |
| Q4 | C | Objective D-8 |
| Q5 | B | Objective D-9 |
| Q6 | D | Objective D-1 |
| Q7 | B | Objective D-2 |
| Q8 | D | Objective D-4 |
03What Unit D covers
Unit D is the calculation half of the Code part: the loads, conductors and protection an FSR signs for. Our nine objectives run from single dwellings, row housing and secondary suites, through apartments with EV charging, non-dwelling and RV park loads, to ampacity, voltage drop, fill, motors and welders, transformers, and grounding and bonding conductors. Several Technical Safety BC bulletins set how a load calculation is done in BC, for row housing, for adding load to an existing house and for EVSE, and those methods are worked here. Each calculation is one question with four options built on the usual slips, so it pays to work the whole method before looking at the answers.
Technical Safety BC gives each of the Class A, B and C exams 60 multiple-choice questions in 3.5 hours, open book, with a 35 per cent focus on the Act, Regulations and Directives and a 65 per cent focus on the Code, and a pass mark of 70 per cent. It publishes nothing finer than that split. Our four units, and our mock's draw of 39 Code questions, 21 of them from Unit D, are ours: 21 and 39 of 60 is our reading of the 35 / 65 split, divided between the units by the size of each. The nine objectives below are TicketPrep's own grouping, and the right-hand column is how many questions our bank holds on each, Standard and Advanced together, not a count from the exam.
| Our objective | In our bank |
|---|---|
| D-1 Single-dwelling, row-housing and secondary-suite loads, and new load on an existing house | 37 |
| D-2 Apartment and multi-unit services, with EVSE and EVEMS | 23 |
| D-3 Non-dwelling, add-load, RV park and mobile home park loads, and continuous loads | 28 |
| D-4 Conductor ampacity, correction factors, terminations and neutrals | 24 |
| D-5 Voltage drop | 16 |
| D-6 Conduit, box and pull-box fill | 12 |
| D-7 Motor, compressor, welder and generator circuits | 28 |
| D-8 Transformer, capacitor, tap and panelboard protection and conductors | 14 |
| D-9 Grounding and bonding conductors, fault current and power factor | 18 |
04What the questions turn on
Row housing and apartments take the BC method
Bulletin IB-EL 2014-01 works row housing with the Rule 8-202 demand steps: each unit's load from Rule 8-200 with its heat taken out, the demand steps applied across the units, and the electric heating added back at its own Rule 62-118 demand. For apartments with EV charging, bulletin IB-EL 2023-05 counts EVSE with no EVEMS at 100 per cent, which is often the largest single line in the total.
Where a correction factor applies
Rule 4-004's correction factors come from how conductors run in raceway or cable, not from how they crowd inside the panelboard where they terminate. At an underground-to-above-ground transition the lower ampacity normally governs, but a short above-ground part, no longer than the lesser of 3 m and one tenth of the run, may take the higher one. A grounding conductor sized by a bulletin, such as IB-EL 2017-02 for step-up and step-down transformer pairs, follows the bulletin's minimum.
Voltage drop on the right current
Rule 8-102 bases the voltage-drop check on the connected load when it is known and otherwise on 80 per cent of the overcurrent device's rating, so a 40 A feeder with no chosen loads is checked at 32 A, against 3 per cent in the feeder and 5 per cent overall. Picking the full breaker rating or the conductor's ampacity is the slip the wrong options use.
Motors at 125 per cent, breakers to the next size
A continuous-duty motor's branch conductors carry at least 125 per cent of its full-load current, read at the termination temperature the equipment is marked for. A feeder breaker is a different question: where no standard rating matches the conductor's ampacity and the load is a Section 8 calculated load within it, Rule 14-104 allows the next standard rating up, as Table 13 lists it, while the conductors still carry no more than the load.
05The other units
Technical Safety BC sets no minimum score for either part, only the 70 per cent pass mark on the whole exam, so every unit's marks count toward it. Each of our four units has its own page of free questions:
The BC FSR practice exam page describes the full question bank. Writing a master electrician exam in another province as well? See the Alberta Master Electrician practice test or the Ontario Master Electrician practice test; for the trade exam itself, the 309A Construction Electrician practice exam. More free questions for every exam we cover: free practice questions. How these questions are written and checked: how our questions are made. Found a mistake? Tell us and we will fix it. TicketPrep is not affiliated with Technical Safety BC or CSA Group. The Canadian Electrical Code is cited by Rule number only and never reproduced; BC statutes are paraphrased, and Technical Safety BC directives and bulletins are cited by number and explained in our own words.