Ten practice questions for the BC electrical Field Safety Representative (FSR) certificate of qualification exam, each with four options and one correct answer. Technical Safety BC sets and delivers the exam. Classes A, B and C each have 60 multiple-choice questions in 3.5 hours, open book, with a pass mark of 70 per cent. These are original questions written by TicketPrep from the BC statutes, the Technical Safety BC directives and bulletins and the Canadian Electrical Code Rule numbers; none of them comes from the exam. They are free to use, print and share. There is nothing to sign up for on this page.
01How to use these
Technical Safety BC says each exam has a 35 per cent focus on the Act, Regulations and Directives and a 65 per cent focus on the Code, and publishes nothing finer than that. The TicketPrep bank splits the exam into four units of our own: Unit A (the Safety Standards Act and the Safety Standards General Regulation) and Unit B (the Electrical Safety Regulation and the Technical Safety BC directives and bulletins) for the Acts, Regulations and Directives, Unit C (code rules) and Unit D (code calculations) for the Code. Four of the ten are Acts, Regulations and Directives questions, two each from Units A and B, and six are code questions, three each from Units C and D, each on a different one of our objectives. One of the ten is a calculation. Answer each one before opening the explanation. Every explanation covers all four options, because knowing why a wrong answer is wrong is most of the skill.
- Pace. 60 questions in 3.5 hours is 3.5 minutes a question. Try these at that pace, with the books open.
- Books. The exam is open book. You bring the current Canadian Electrical Code, Part I (the 2024 edition has been the B.C. Electrical Code since March 4, 2025); the CEC Handbook and pocket references are not allowed, and pages with handwritten formulas or worked examples must come out. Technical Safety BC supplies online links to the Safety Standards Act, the two regulations and its directives and bulletins during the exam. The questions cite the section, Rule or notice they rest on, so you can practise finding it.
- Class. These ten follow the Class B and Class C scope, which is the whole code except Section 36. Class A adds Section 36 (high voltage) and CSA C22.3 No. 1, Overhead Systems.
- Print. The printed version shows the questions and the answer key without the explanations, so it works as a handout. The explanations are on the web page. Download PDF
- Mark. The pass mark is 70 per cent of the whole exam, and Technical Safety BC sets no separate minimum for either part, so the code questions, about two thirds of the marks, decide most results.
02The questions
-
A safety officer issues an installation permit to a licensed electrical contractor for a winery's new pump-house wiring, but attaches a term the contractor did not ask for. The contractor asks for written notice of that decision. Under SSA s.27, what must the notice state?
- the reasons, and the right to seek a safety manager's review in writing or to appeal to the appeal board
- the reasons, and the right to appeal to the appeal board only, with no review by a safety manager first
- the reasons, and the right to ask a safety manager for a review, whose decision is then final and binding
- the reasons, and the right to apply to the Supreme Court for an order cancelling the unrequested term
Show the answer
A. Correct. SSA s.27(2) requires the officer to tell an applicant when a permission is refused or carries unrequested terms, and to give written notice on request; s.27(5) says that notice gives the reasons and both routes: a written review request to a safety manager under s.49, or an appeal to the Safety Standards Appeal Board.
Why not the others
B. Appeal-only notices belong to other decisions, such as a refused contractor licence or certificate (SSA ss.23(8), 26(5)) or a discipline order (s.42(2)). For a permit issued with unrequested terms, s.27(5) offers a safety-manager review under s.49 as well as the appeal.
C. That is the variance route: a refused variance gets a review only, and the review decision cannot be appealed (SSA s.32(5)-(6)). A permit decision under s.27 carries both routes, a review under s.49 or an appeal to the appeal board (s.27(5)).
D. The Act's Supreme Court application in SSA s.39 is a safety manager's tool to enforce a safety order or compliance order, not an applicant's challenge to a permit term. SSA s.27(5) names the applicant's routes: a safety-manager review under s.49 or an appeal to the appeal board.
Source: TSBC FSR exam, Acts, Regulations and Directives (our Unit A: Safety Standards Act and General Regulation); Safety Standards Act s.27
-
On a Sunday night after a windstorm, a safety officer finds that a vacant house awaiting demolition has a torn service mast with live conductors hanging near a public sidewalk. The owner cannot be reached, and no contractor or other person is available to act. Under SSA s.18(4), what may the safety officer do?
- Recommend that a provincial safety manager issue a safety order at once
- Issue a compliance order to the owner and wait for the owner to comply
- Take the needed action and issue a safety order a manager could make
- Note the hazard and ask a safety manager to authorize emergency action
Show the answer
C. Correct. SSA s.18(4) lets a safety officer who considers immediate action necessary to prevent or reduce a risk of injury or damage, where no person could carry out the action, take that action and issue any safety order a safety manager could make under s.31(4), such as requiring the equipment to be disconnected or made safe.
Why not the others
A. Safety orders are normally a provincial safety manager's (SSA s.31), but SSA s.18(4) gives the safety officer the power directly when immediate action is needed and no one else can act, so no recommendation is needed.
B. A compliance order (SSA s.38) suits a risk the person can fix. Here the owner cannot be reached and nobody can act, so waiting leaves live conductors by a sidewalk; SSA s.18(4) lets the officer act now.
D. No manager's authorization is required. SSA s.18(4) itself lets the safety officer take the necessary action, and issue a safety order, where immediate action is needed and nobody else can carry it out.
Source: TSBC FSR exam, Acts, Regulations and Directives (our Unit A: Safety Standards Act and General Regulation); Safety Standards Act s.18
-
ESR s.6 limits who is eligible to apply for an FSR certificate of qualification. Which of these individuals is eligible to apply on the basis described?
- a gas fitter who holds a Gas Safety Regulation certificate and wires furnace controls
- an employee trained in an employer program that a provincial safety manager approved
- a manufacturer's technical representative with ten years on its own company's switchgear
- a homeowner who has wired two of his own fully detached houses under homeowner permits
Show the answer
B. Correct. ESR s.6(a) makes anyone under s.4(1)(a) to (c) eligible, and s.4(1)(c) is the employee who completed the relevant training in an employer's program approved by a provincial safety manager. Applied technologists and professional engineers are the other two bases.
Why not the others
A. A gas certificate lets its holder do electrical work under ESR s.4(1)(f), but s.6 admits only s.4(1)(a) to (c) individuals, applied technologists and professional engineers. The gas route is not among them.
C. Experience as a manufacturer's technical representative (ESR s.4(1)(e)) is not an eligibility basis under ESR s.6, however long it is.
D. Homeowner work rests on ESR s.4(1)(d), which s.6 does not list. Wiring one's own house gives no eligibility to apply for an FSR certificate.
Source: TSBC FSR exam, Acts, Regulations and Directives (our Unit B: Electrical Safety Regulation, Directives and Bulletins); Electrical Safety Regulation s.6
-
Updating a contractor's incident procedure, an FSR finds two TSBC electrical notices on incident reporting: the directive D-E3 070115 1, now marked rescinded, and the information bulletin IB-EL 2017-03. Which should the procedure follow, and with what standing?
- The bulletin, as TSBC's guidance on the Act's reporting duty
- The directive, as a binding interpretation under SSA s.30
- Both, with the directive binding and the bulletin only advisory
- The directive, until a safety order is issued to replace it
Show the answer
A. Correct. TSBC rescinded D-E3 070115 1 and replaced it with IB-EL 2017-03, and a rescinded notice is not current guidance. The binding duty to report is in SSA s.36 and SSGR s.34; the bulletin is TSBC's guidance on how it is met (who reports, when and how).
Why not the others
B. A directive binds only while it is in force. D-E3 070115 1 is marked rescinded and was replaced by the bulletin IB-EL 2017-03, so it has no force now.
C. A rescinded directive binds no one, so there is nothing to combine. The current notice is IB-EL 2017-03, read with SSA s.36 and SSGR s.34.
D. Rescission ends a directive's force; no safety order is needed to replace it. TSBC replaced the incident directive with the bulletin IB-EL 2017-03.
Source: TSBC FSR exam, Acts, Regulations and Directives (our Unit B: Electrical Safety Regulation, Directives and Bulletins); Safety Standards Act s.30; TSBC IB-EL 2017-03
-
At a house, the crew makes the grounding-conductor connection to the neutral in the meter base and leaves the system bonding jumper in the service box of the combination panel. Per TSBC's bulletin IB-EL 2023-04, is this acceptable?
- Yes, if the meter-base neutral is kept isolated
- Yes; Rule 10-210 asks only for one grounding point
- No; both connections belong in the same enclosure
- No; both must be made at the meter base
Show the answer
C. Correct. IB-EL 2023-04 says the neutral's grounding connection and its system bonding jumper belong together in one enclosure at the consumer's service, either the meter base (Appendix B Figure B10-4) or the service box (Figure B10-5). Split between enclosures, bonding conductors, armour or raceways can carry neutral current in parallel, which Rule 10-500 forbids.
Why not the others
A. Isolating the meter-base neutral is right when the grounding is done in the service box. Here the grounding connection is in the meter base and the jumper in the service box, which IB-EL 2023-04 does not accept.
B. Rule 10-210 a) does call for one grounding point at the consumer's service, but TSBC's bulletin explains that separating the grounding connection from the system bonding jumper creates parallel neutral paths contrary to Rule 10-500.
D. Either enclosure works as long as both connections are in it: the bulletin points to the meter-base arrangement and the service-box arrangement as both acceptable.
Source: TSBC FSR exam, Code (our Unit C: BC Electrical Code Rules); CEC Rules 10-210, 10-500; TSBC IB-EL 2023-04
-
A Class C FSR is running a 120/240 V feeder from a house's main panelboard to a panelboard in a detached workshop. The house's service conductors have an ampacity of 100 A. Working from the Sections for the workshop's equipment, the designer arrives at feeder conductors of 110 A ampacity. Under Rule 8-106 7), what does the feeder need?
- Conductors that need not exceed the 100 A ampacity of the service conductors
- Conductors of at least 110 A, since the equipment Sections always govern feeders
- Conductors of at least 110 A, plus a 25 % margin for future workshop load
- Conductors that need not exceed 80 % of the service conductors' ampacity, 80 A
Show the answer
A. Correct. Rule 8-106 7) says that, notwithstanding the rest of Section 8, the ampacity of a feeder's or branch circuit's conductors need not exceed the ampacity of the service or feeder conductors that supply them. Feeder conductors of 100 A ampacity therefore satisfy the rule here, even though the equipment Sections point to 110 A; larger ones are allowed but not required.
Why not the others
B. Rule 8-106 6) does point to the equipment Sections for feeder ampacity, but 8-106 7) applies notwithstanding the rest of Section 8: a feeder's conductors need not exceed the ampacity of the service conductors that supply it, here 100 A.
C. Section 8 adds no general 25 % margin for future load, and 8-106 7) caps what the feeder needs at the 100 A ampacity of the service conductors supplying it.
D. No 80 % reduction applies; the 80 % figures in Section 8 concern continuous loads under 8-104 6). Rule 8-106 7) relieves the feeder only down to the full 100 A ampacity of the supplying service conductors.
Source: TSBC FSR exam, Code (our Unit C: BC Electrical Code Rules); CEC Rule 8-106
-
A house is subdivided into a main unit and a separately metered suite, each with its own panelboard. To shorten the runs, both panels go in the main unit's attached garage, which the suite tenant has no right to enter. Under IB-EL 2023-03, how should the FSR treat the suite panel's location?
- Compliant, as the owner can reach both panels in the garage
- Non-compliant unless the garage is a common area open to both parties
- Compliant, if the suite panel's top breaker handle is no higher than 1.7 m
- Compliant, if the suite panel is labelled as serving the suite
Show the answer
B. Correct. IB-EL 2023-03 Table 2: for a subdivided house with two separately metered panels both in the garage, the location complies only if the garage is a common area and both parties have access; if either answer is no, it does not. Here the garage belongs to the main unit, so the suite panel must move.
Why not the others
A. Owner access settles the case only for a suite that is not separately metered. For two separately metered units with both panels in one place, IB-EL 2023-03 asks whether the place is a common area and whether both parties can get to it.
C. The 1.7 m limit in Rule 26-600 is a mounting-height rule and says nothing about who can reach the room. IB-EL 2023-03's test for this layout is a common area that both parties can get into.
D. Labels identify the panel but do not give the suite occupant access to it. IB-EL 2023-03 treats both panels in the garage as compliant only when the garage is a common area open to both parties.
Source: TSBC FSR exam, Code (our Unit C: BC Electrical Code Rules); CEC Rules 14-106, 14-406, 26-600, 26-602; TSBC IB-EL 2023-03
-
A 120/240 V, 125 A feeder supplies the glycol chiller panel of a craft brewery. The chiller compressors cycle on and off all day, and the FSR has no run-time records. How must Rule 8-104 treat the feeder's calculated load?
- As continuous, unless records show it meets the run-time test
- As non-continuous, since cycling loads never run steadily
- As continuous, but only for the part above 100 A
- As non-continuous, since only loads over 225 A can be continuous
Show the answer
A. Correct. Rule 8-104 4) classes a cyclic or intermittent load as continuous unless it passes the Subrule 3) test; at 225 A or less that means showing it never runs more than 1 h in total in any 2 h. With no records the FSR treats the chiller load as continuous and holds it to the 8-104 5) or 6) limits.
Why not the others
B. Cycling does not make a load non-continuous. Rule 8-104 4) takes a cyclic load as continuous unless it is shown to meet the 1 h in 2 h test of 8-104 3) a); without run-time data that cannot be shown.
C. Rule 8-104 does not split a load at 100 A. The whole calculated load is either continuous or not, and a cyclic load is continuous unless it is shown to meet the run-time test of 8-104 3).
D. 225 A is only the boundary between the two run-time tests: loads of 225 A or less use 1 h in any 2 h and larger loads 3 h in any 6 h (8-104 3)). A 125 A cyclic load is continuous unless shown otherwise.
Source: TSBC FSR exam, Code (our Unit D: BC Electrical Code Calculations); CEC Rule 8-104
-
An FSR's crew will pull a feeder together with a bare copper bonding conductor into rigid PVC conduit. Under Rule 12-910, how is the bare bonding conductor treated in the conduit-fill check?
- It is left out, as bonding conductors are never counted
- Its area, from Table D5 or measured, is added to the fill
- It is added at the area of an insulated conductor of its size
- It counts toward the number of conductors but adds no area
Show the answer
B. Correct. Rule 12-910 4) d) lets the dimensions of uninsulated conductors come from Table D5 or field measurement, so the fill check includes them. A bare bonding conductor takes space the other conductors must clear, so its area goes into the total compared with the Table 8 percentage.
Why not the others
A. Leaving bonding conductors out is the ampacity counting rule of Rule 4-004, which deals with heating. Fill under Rule 12-910 deals with physical space, and a bare bonding conductor takes space: its Table D5 or measured area is included.
C. Rule 12-910 4) d) gives bare conductors their own dimensions, from Table D5 or field measurement. Using an insulated conductor's Table 6 area overstates the space a bare conductor takes.
D. Rule 12-910 compares the total cross-sectional area with the Table 8 percentage. A bare bonding conductor has real area, from Table D5 or field measurement, and that area goes into the total.
Source: TSBC FSR exam, Code (our Unit D: BC Electrical Code Calculations); CEC Rule 12-910
-
At a lakeside RV park, one lot's pedestal has a TT-30R, a 5-20R and a 5-15R receptacle, and no other loads serve the lot. What load does Rule 72-102 assign to that lot for the service calculation?
- 2880 W
- 3600 W
- 7200 W
- 7800 W
Show the answer
B. Correct. Where a lot has receptacles of different ratings, Rule 72-102 3) b) uses the highest-rated one, and 72-102 2) b) assigns 3600 W to a TT-30R. The 5-20R (2400 W) and 5-15R (1800 W) on the same lot add nothing.
Why not the others
A. This takes 80 % of 30 A at 120 V, as if Rule 8-104 set the lot load. Rule 72-102 2) b) fixes a TT-30R lot at 3600 W.
C. This multiplies 30 A by 240 V. A TT-30R is a 120 V receptacle, and Rule 72-102 2) b) assigns it 3600 W.
D. This adds all three receptacles (3600 + 2400 + 1800 W). Rule 72-102 3) b) counts only the highest-rated receptacle on a lot, so the lot is 3600 W.
Source: TSBC FSR exam, Code (our Unit D: BC Electrical Code Calculations); CEC Rule 72-102
03Answer key
| Question | Answer | Our unit |
|---|---|---|
| Q1 | A | Unit A Safety Standards Act and General Regulation |
| Q2 | C | Unit A Safety Standards Act and General Regulation |
| Q3 | B | Unit B Electrical Safety Regulation, Directives and Bulletins |
| Q4 | A | Unit B Electrical Safety Regulation, Directives and Bulletins |
| Q5 | C | Unit C BC Electrical Code Rules |
| Q6 | A | Unit C BC Electrical Code Rules |
| Q7 | B | Unit C BC Electrical Code Rules |
| Q8 | A | Unit D BC Electrical Code Calculations |
| Q9 | B | Unit D BC Electrical Code Calculations |
| Q10 | B | Unit D BC Electrical Code Calculations |
04More free questions
For the exam itself, the BC FSR exam guide covers the classes, the format, the 35 / 65 split, the books you may use, booking and the fees; how to become a Field Safety Representative in BC covers who may write and what the certificate lets you do; and the BC FSR practice exam page has five more sample questions and describes the full TicketPrep bank. Each of our four units also has eight free questions of its own: Unit A Safety Standards Act and General Regulation, Unit B Electrical Safety Regulation, Directives and Bulletins, Unit C BC Electrical Code Rules, Unit D BC Electrical Code Calculations. The same free format covers the Alberta and Ontario Master Electrician exams and the 309A Construction Electrician trade too.
How these questions are written and checked: how our questions are made. Found a mistake? Tell us and we will fix it. TicketPrep is an independent study site; it is not affiliated with Technical Safety BC or CSA Group. Nothing here is taken from the exam, and no CEC text, table or definition is reproduced: the questions cite Rule numbers, statute sections and directive and bulletin numbers and explain each requirement in their own words.