Eight free practice questions on the Electrical Safety Regulation and TSBC directives and bulletins, for Unit B (Electrical Safety Regulation, Directives and Bulletins) of the TicketPrep bank for the BC electrical Field Safety Representative (FSR) certificate of qualification exam, Classes A, B and C. Technical Safety BC sets and delivers the exam. These are original questions written by TicketPrep from the BC statutes, the Technical Safety BC directives and bulletins and the Canadian Electrical Code Rule numbers, not questions from the exam. Each has four options and one correct answer, as every question in our bank does. Answer each one before opening the explanation. No account, no email.
01The questions
-
Each half of a side-by-side duplex has its own utility service and meter. A licensed electrical contractor will replace the panel in both halves this month. Under ESR s.11(1), how many installation permits does the job need?
- one, because the duplex is a single building
- one, if a single owner holds title to both halves
- two, but only if the halves sit on separate strata titles
- two, one for each half, since each has its own supply
Show the answer
D. Correct. ESR s.11(1) ties permits to supplies: one for every structure with its own supply, and one for every part of a structure fed by its own supply service. Each half has its own service, so each needs a permit.
Why not the others
A. One building is not the test when it has two supplies. Under ESR s.11(1)(b) every part of a building fed by its own supply service needs its own permit.
B. Ownership does not decide the count. The permit follows the supply: each portion with its own supply service needs its own permit under ESR s.11(1)(b).
C. Title does not enter into it. Two separate supply services mean two permits under ESR s.11(1)(b), whether or not the halves are separately titled.
Source: TSBC FSR exam, Acts, Regulations and Directives (our Unit B: Electrical Safety Regulation, Directives and Bulletins); Electrical Safety Regulation s.11
-
A wood pellet plant applies for an operating permit so its own electricians can maintain the plant's electrical equipment. SSGR s.18(4) says an operating-permit application need not name an FSR unless a regulation says otherwise. What does ESR s.14 require of this application?
- It must give the name, class and certificate number of the FSR who will do or supervise the maintenance
- It may leave the FSR out, and the owner names one before the first maintenance job is entered in the log
- It must give the licence number of the electrical contractor whose staff will supervise the maintenance
- It must give the FSR's name, class and certificate number only where the supply is over 250 kVA
Show the answer
A. Correct. ESR s.14 is the regulation that displaces the SSGR s.18(4) default: where electrical maintenance is done on a building or premises, the operating-permit application must name the FSR who will perform or supervise that work, with the FSR's class and certificate of qualification number. D-E3 070801 7 adds that this FSR may be the owner's employee or contracted by the owner.
Why not the others
B. SSGR s.18(4) is only the default. ESR s.14 overrides it for electrical maintenance, so the FSR's name, class and certificate number go on the application itself, not later.
C. ESR s.14 asks for an individual FSR, not a contractor's licence. An owner may use an FSR employed by a licensed electrical contractor (D-E3 070801 7), but the application still names that person, with class and certificate number.
D. Over 250 kVA is one of the D-E3 070801 7 triggers that make an operating permit necessary at all; it is not a condition in ESR s.14. Where maintenance is done under the permit, the FSR must be named whatever the supply size.
Source: TSBC FSR exam, Acts, Regulations and Directives (our Unit B: Electrical Safety Regulation, Directives and Bulletins); Safety Standards General Regulation s.18; Electrical Safety Regulation s.14; TSBC D-E3 070801 7
-
Under ESR s.20, which document does British Columbia take on as its B.C. Electrical Code?
- CSA C22.1:24, the 26th edition of CEC Part I, with the TSBC directives written in as amendments
- CSA C22.1:21, the 25th edition of CEC Part I, with the BC deviations listed in the ESR Schedule
- CSA C22.1:24, the 26th edition of CEC Part I, as amended by the ESR Schedule, with any errata
- CSA C22.1:24 for new work, and the edition in force when built for existing installations
Show the answer
C. Correct. ESR s.20, as amended by Ministerial Order M132/2024 (B.C. Reg. 118/2024), adopts the Canadian Electrical Code, Part I, 26th edition (CSA C22.1:24), amended as set out in the ESR Schedule and including any errata. The Schedule's surviving amendments only change definitions.
Why not the others
A. TSBC directives are binding interpretations issued by a provincial safety manager under SSA s.30; they are not written into the adopted code. ESR s.20 adopts the 26th edition amended only by the ESR Schedule.
B. The 25th edition was replaced in s.20 by M132/2024 from March 4, 2025. TSBC's bulletin IB-EL 2024-01 adds that there are no deviations from the CEC this cycle.
D. ESR s.20 adopts one edition, the 26th. Which edition governs a job under a permit issued before March 4, 2025 is set by TSBC's transition bulletin IB-EL 2024-01, not by a split in s.20.
Source: TSBC FSR exam, Acts, Regulations and Directives (our Unit B: Electrical Safety Regulation, Directives and Bulletins); Electrical Safety Regulation s.20; TSBC IB-EL 2024-01
-
A manufacturer's technical representative is commissioning his company's standby generator at a care home. To save time he asks the owner's maintenance helper, who holds no electrical credential, to land the transfer-switch conductors while he watches. Under ESR s.4(3), may the helper do it?
- No; his role as the maker's representative gives him no power to supervise
- Yes, because the work is on equipment made by the representative's own company
- No; only the FSR named on the installation permit may supervise a helper
- Yes, if the representative stays on site and gives guidance while the work is done
Show the answer
A. Correct. ESR s.4(3) lets only individuals under s.4(1)(a), (b), (c) or (f) supervise under SSGR s.5. The representative works under s.4(1)(e), so he may work on his company's product himself but cannot supervise the helper.
Why not the others
B. His right to work on his company's product is his own; ESR s.4(3) does not let him extend it to an unqualified helper by supervising.
C. ESR s.4(3) is wider than the named FSR: any individual under s.4(1)(a), (b), (c) or (f) may supervise. The helper fails here because the representative is not one of them.
D. Being on site and guiding the work describes how supervision is done under SSGR s.5(1), but it does not give the representative the authority to supervise; ESR s.4(3) withholds that from him.
Source: TSBC FSR exam, Acts, Regulations and Directives (our Unit B: Electrical Safety Regulation, Directives and Bulletins); Safety Standards General Regulation s.5; Electrical Safety Regulation s.4
-
A BC-certified construction electrician has 2 900 hours of acceptable experience since certification, finished a recognized codes course 10 months ago, and has documented three high-voltage installations since certification. Under TSBC's class pages, which FSR classes may she apply for now?
- Class B or C, but not yet Class A
- Class C only, until she has held Class C for a full year
- Class A, B or C, as she has all three high-voltage installations
- Class A only, as her high-voltage work exceeds Class B scope
Show the answer
A. Correct. TSBC's pages ask electricians for one year (1 800 hours) after the trade certificate for Class B or C, and two years (3 600 hours) plus three documented high-voltage installations for Class A. With 2 900 hours and a recent course she qualifies for B or C only.
Why not the others
B. Holding Class C first is an applied technologist's option under ESR s.9(2); TSBC's electrician route for Class B has no such step.
C. The installations meet one Class A condition, but TSBC's Class A page also asks for two years (3 600 hours) of experience after the trade certificate. At 2 900 hours she is short.
D. High-voltage installations do not remove her eligibility for lower classes; ESR s.8(3) even lets a Class A qualifier take B or C. In any case her hours are short of Class A.
Source: TSBC FSR exam, Acts, Regulations and Directives (our Unit B: Electrical Safety Regulation, Directives and Bulletins); Electrical Safety Regulation s.8
-
A homeowner took out a homeowner permit on April 1 to rewire the basement of his fully detached house and is working slowly. No phase is finished and no inspection has been made. Under ESR s.17(4), when must he request an inspection?
- within 30 days after the permit is issued
- just before 180 days have passed since the permit began
- only once all of the work is complete, however long that may take
- never, as the homeowner permit simply expires after 180 days
Show the answer
B. Correct. ESR s.17(4) has a homeowner request an inspection promptly when the work or a phase is complete, or, where 180 days since the permit began are about to pass with no inspection, just before they do.
Why not the others
A. ESR s.17(4) sets no 30-day request. With no phase complete, the deadline is just before 180 days have passed since the permit began.
C. Completion is one trigger, but s.17(4)(b) also sets a time trigger: if 180 days since the permit began are about to pass with no inspection, he must ask for one first.
D. ESR s.17(4)(b) is a duty to request an inspection, not an expiry rule; the permit does not lapse at 180 days under that section.
Source: TSBC FSR exam, Acts, Regulations and Directives (our Unit B: Electrical Safety Regulation, Directives and Bulletins); Electrical Safety Regulation s.17
-
A sawmill's operating permit names, as its FSR, an employee of a licensed electrical contractor. On Monday the contractor ends that FSR's employment, and the sawmill stops using the contractor. Under SSGR s.19(d) as D-E3 070801 7 interprets it, what must the sawmill do?
- Name a replacement FSR when it renews the permit, and record the change in the permit log
- Notify the regulatory authority in writing within 5 working days, and enter it in the log
- Leave the notice to the contractor, which tells a provincial safety manager about its own FSR
- Notify the regulatory authority by the end of the next business day, by phone or in writing
Show the answer
B. Correct. SSGR s.19(d) makes the operating-permit holder notify the regulatory authority immediately when the named FSR stops being contracted or employed by it. D-E3 070801 7 reads 'immediately' as within 5 working days, requires the notice in writing to the authority having jurisdiction, and requires an entry in the permit log.
Why not the others
A. Waiting for renewal breaks SSGR s.19(d): the notice is due immediately, which D-E3 070801 7 reads as within 5 working days, in writing, with a log entry.
C. The contractor's duty under SSGR s.9 concerns the FSR named on its licence. The sawmill, as operating-permit holder, has its own duty under s.19(d): written notice within 5 working days, plus a log entry.
D. The end of the next business day is the permit-application deadline after emergency work (D-EL 2018-01). The FSR-change notice under an operating permit is due within 5 working days, must be in writing, and goes in the log.
Source: TSBC FSR exam, Acts, Regulations and Directives (our Unit B: Electrical Safety Regulation, Directives and Bulletins); Safety Standards General Regulation s.19; TSBC D-E3 070801 7
-
A custom-built electric kiln at a pottery studio receives an approval mark issued under SSA s.10. Under ESR s.21(2), what does that approval mark signify?
- Compliance with fire, electrical shock and energy-efficiency requirements
- Compliance with every requirement of the applicable CSA product standard
- Compliance with the B.C. Electrical Code rules for its installation on site
- Compliance with the requirements on fire and electrical shock hazards
Show the answer
D. Correct. ESR s.21(2) limits what an SSA s.10 approval mark means: it covers fire and electric-shock hazards and nothing more. It is narrower than certification to a product standard, and the installation still has to meet the B.C. Electrical Code under its permit.
Why not the others
A. ESR s.21(2) mentions no energy-efficiency requirement; the approval mark signifies fire and electrical shock compliance only.
B. Conformity to a product standard is what a certification agency's mark shows. An SSA s.10 approval mark is narrower: fire and electrical shock hazards only (ESR s.21(2)).
C. Marks and labels concern the product. The installation is dealt with under the permit, by inspection or the FSR's declaration. ESR s.21(2) limits the approval mark's meaning to fire and shock hazards.
Source: TSBC FSR exam, Acts, Regulations and Directives (our Unit B: Electrical Safety Regulation, Directives and Bulletins); Safety Standards Act s.10; Electrical Safety Regulation s.21
02Answer key
| Question | Answer | Our objective |
|---|---|---|
| Q1 | D | Objective B-3 |
| Q2 | A | Objective B-4 |
| Q3 | C | Objective B-5 |
| Q4 | A | Objective B-1 |
| Q5 | A | Objective B-2 |
| Q6 | B | Objective B-3 |
| Q7 | B | Objective B-4 |
| Q8 | D | Objective B-5 |
03What Unit B covers
Unit B is the electrical layer of the Acts, Regulations and Directives: the Electrical Safety Regulation and the directives and information bulletins Technical Safety BC issues for electrical work. Our six objectives for it are who may do regulated electrical work; FSR certificates of qualification and their classes; installation and homeowner permits, inspection and declarations; operating permits; the code, regulated products and approval marks; and emergencies, incidents, utilities, recreational vehicles and how the notices work. The questions turn on exact wording: which individuals may supervise, what one permit covers, how many days a step allows, and what a directive adds to the regulation it interprets. Check too that a notice is still in force: a rescinded one is never the rule.
Technical Safety BC gives each of the Class A, B and C exams 60 multiple-choice questions in 3.5 hours, open book, with a 35 per cent focus on the Act, Regulations and Directives and a 65 per cent focus on the Code, and a pass mark of 70 per cent. It publishes nothing finer than that split. Our four units, and our mock's draw of 21 Acts, Regulations and Directives questions, 12 of them from Unit B, are ours: 21 and 39 of 60 is our reading of the 35 / 65 split, divided between the units by the size of each. The six objectives below are TicketPrep's own grouping, and the right-hand column is how many questions our bank holds on each, Standard and Advanced together, not a count from the exam.
| Our objective | In our bank |
|---|---|
| B-1 Who may do regulated electrical work | 18 |
| B-2 FSR certificates of qualification | 19 |
| B-3 Electrical permits, homeowner work, inspection and declarations | 27 |
| B-4 Operating permits | 15 |
| B-5 The code, regulated products and approval marks | 13 |
| B-6 Emergencies, incidents, utilities, recreational vehicles and the notice system | 18 |
04What the questions turn on
Permits follow the supply
The Electrical Safety Regulation ties installation permits to supplies, not to buildings or jobs: one for each structure with its own supply, and one for each part of a structure fed by its own supply service (ESR s.11). Two halves of a duplex, each with its own service, need two permits even when the same contractor does both in one visit. A homeowner permit has its own clock: an inspection is requested when the work or a phase is done, or just before 180 days pass with none.
An operating permit names its FSR
The General Regulation says an operating-permit application need not name an FSR unless a regulation says otherwise, and for electrical maintenance ESR s.14 does: the application names the FSR who will do or supervise the work, with the class and certificate number. When that FSR stops being employed or contracted, the permit holder must notify the authority immediately, which directive D-E3 070801 7 reads as in writing within five working days, with an entry in the permit log.
Supervision has a short list
ESR s.4 lists the individuals who may do regulated electrical work, but only some of them may also supervise others. A manufacturer's representative may work on the company's own product, yet cannot supervise a helper with no credential. The classes have their own thresholds: TSBC asks for one year (1 800 hours) after the trade certificate for Class B or C, and two years (3 600 hours) plus three documented high-voltage installations for Class A.
Which code, and what an approval mark means
ESR s.20 adopts the Canadian Electrical Code, Part I, 26th edition (CSA C22.1:24) as the B.C. Electrical Code, amended only by the ESR Schedule, whose surviving changes are definitions. A product approved under SSA s.10 carries a mark that the ESR limits to fire and electric-shock hazards; it is narrower than certification to a product standard, and the installation still has to meet the code under its permit.
05The other units
Technical Safety BC sets no minimum score for either part, only the 70 per cent pass mark on the whole exam, so every unit's marks count toward it. Each of our four units has its own page of free questions:
The BC FSR practice exam page describes the full question bank. Writing a master electrician exam in another province as well? See the Alberta Master Electrician practice test or the Ontario Master Electrician practice test; for the trade exam itself, the 309A Construction Electrician practice exam. More free questions for every exam we cover: free practice questions. How these questions are written and checked: how our questions are made. Found a mistake? Tell us and we will fix it. TicketPrep is not affiliated with Technical Safety BC or CSA Group. The Canadian Electrical Code is cited by Rule number only and never reproduced; BC statutes are paraphrased, and Technical Safety BC directives and bulletins are cited by number and explained in our own words.