4th Class Power Engineering, Part B
Twelve units, B1 to B12, and 52 objectives on the SOPEEC syllabus, from lubrication, pumps and boiler safety devices to boiler operation, water treatment, turbines, refrigeration and HVAC. Mostly operating knowledge, with some calculations in pumps, safety valves, water treatment, refrigeration and heating loads. None of SOPEEC, ABSA, Technical Safety BC, TSASK or TSSA publishes how many questions come from each unit, so the bank covers every objective.
Question mix: not published by SOPEEC
- Questions
- 100
- Time
- 3 hours
- Sections
- 12 units
- Bank
- 550 written